Time Left - 06:00 mins

SSC JE CE 2017- Surveying, Cost Est. and valuation Rankers Quiz 2

Attempt now to get your rank among 2789 students!

Question 1

In plane table, the operation which must be carried out is

Question 2

The shape of the vertical curve generally provided is

Question 3

In a closed traverse, the algebraic sum of departure and latitude must be equal to

Question 4

If fore bearing of a line is Description: E:\Gate\SSC JE Civil Part 1\Practice-Set-10_files\image001.png the back bearing of the line is

Question 5

The type of surveying in which the curvature of the earth is taken into account is called

Question 6

Group I lists tool/instrument while Group II lists the method of surveying. Match the tool/instrument with the corresponding method of surveying.

Group–I
P. Alidade
Q. Arrow
R. Bubble tube
S. Stadia hair
Group–II
1. Chain surveying
2. Levelling
3. Plain table surveying
4. Theodilite surveying

Question 7

In a survey work, three independent angle, X, Y and Z were observed with weight WX, WY, Wz respectively. The weight of the sum of angles X, Y and Z is given by:

Question 8

The value of the dismantled material less the cost of dismantling is called _______.

Question 9

The value of the property (without being dismantled) at the end of the useful life period is known as _____.

Question 10

The sum of interior angles of a closed traverse is
  • 2789 attempts
  • 8 upvotes
  • 126 comments
May 9ESE & GATE CE