Time Left - 06:00 mins

SSC JE CE 2017- Surveying, Cost Estimation and valuation Ranker Quiz 6

Attempt now to get your rank among 4543 students!

Question 1

The concrete work for the following part of the building of specified thickness is measured in square meters ______.

Question 2

The item of steel work is measured sq. m is _______

Question 3

The technique of finding the fair price of an existing building or property is known as ______.

Question 4

Which of the following is the most correct estimate?

Question 5

The surface of zero elevation around the earth, which is slightly irregular and curved is known as ________.

Question 6

The rise and fall method of reduction of levels, provides a check on _____.

Question 7

Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units is ______.

Question 8

A relatively fixed point of known elevation above datum is called ______.

Question 9

Section AA indicates:

Question 10

Hydrographic survey deals with the mapping of _______.
  • 4543 attempts
  • 10 upvotes
  • 125 comments
Dec 6ESE & GATE CE