Match the following tests on aggregate and its properties
TEST
P. Crushing Test
Q. Los Angles abrasion test
R. Soundness test
S. Angularity test

PROPERTY
1) Hardness
2) Weathering
3) Shape
4) Strength

Question 2

The constraints in case of resource smoothening operation would be

Question 3

An earth moving equipment costs Rs. 5,00,000/- and has an estimated life of 10 years and a salvage value of Rs. 50,000/-.What uniform annual amount (in Rs) must be set aside at the end of each of the 10 years for replacement if the interest rate is 8% per annum and if the sinking fund factor at 8% per annum interest rate for 10 years is 0.069 ?

Question 4

If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is

Question 5

The following table contains data on four activities, A, B, C and D

The maximum total resource load in any week will be

Question 6

In Marshall testing of bituminous mixes, as the bitumen content increases the flow value