VIZAG M.T. Exam. 2017- Industrial Engineering Quiz 1

Attempt now to get your rank among 811 students!

Question 1

Rolling horizon in forecast is used for

Question 2

In ABC analysis, A items require:

Question 3

The lead time in material requirements planning is the time between

Question 4

Which of the following method is NOT used for obtaining the initial basic feasible solution in transportation problems?

Question 5

Maximize Description: F:\GradeStack Courses\GATE Tests (Sent by Ravi)\GATE-22-April\GATE-IES-ME-Industrial-Engineering_files\image081.png
subject to
 
The solution to the above LPP is