ESE ME 2018: Industrial Engineering Achievers National Test
Attempt now to get your rank among 556 students!
Question 1
Consider the following statements:
The objective of value analysis is:
1). To reduce the cost
2). To increase the profit
3). To improve quality
Which of these statements are correct?
The objective of value analysis is:
1). To reduce the cost
2). To increase the profit
3). To improve quality
Which of these statements are correct?
Question 2
In an exponentially weighted moving average, the weight of the demand and past periods
Question 3
The shortest processing time prioritization rule is used for
Question 4
A part is made from solid brass rod of 38 mm diameter and length 25 mm. The machining time taken to finish the part is 90 minutes and labour rate is Rs. 2 per hour. Factory overhead are 50% of direct labour cost. The density of material is 8.6 gm per cubic cm and its cost is Rs. 1.625 per newton. The factory cost of the part will be
Question 5
A tie for leaving variables in simplex procedure implies____.
Question 6
Which one of the following statements is not correct?
Question 7
What is the name of the cost involved in earlier decision in production?
Question 8
A single-bay car wash with a Poisson arrival rate and exponential service time has cars arriving at an average rate of 10 minutes apart and an average service time of 4 minutes. What is the system utilization______?
Question 9
The following information is added updating the inventory status file in MRP:
Question 10
Which of the following method is NOT used for obtaining the initial basic feasible solution in transportation problems?
Question 11
In PERT analysis a critical activity has
Question 12
A minimal spanning tree in network flow models involves ___.
Question 13
A project consists of 7 activities. The network along with the time durations (in days) for various activities is shown in the figure
The minimum time (in days) for completion of the project is _________
The minimum time (in days) for completion of the project is _________
Question 14
Demand during lead time with associated probabilities is shown below:
Expected demand during lead time is
Expected demand during lead time is
Question 15
For a given simplex problem, the obtained replacement ratio are 10, 12, 10 then the solution is