SSC JE CE 2017- Environmental Engineering Rankers Quiz 2

Attempt now to get your rank among 2042 students!

Question 1

In an activated sludge plant F/M (Food to Microorganism) the ratio is equal to

Question 2

If Vs is the settling velocity and Vv  is the overflow velocity, then a particle will settle in a vertical settling tank when

Question 3

Disinfection of drinking water is done to remove

Question 4

Which of the following sewage treatment methods has inherent problems of odour, ponding, and fly nuisance?

Question 5

From amongst the following sewage treatment options, largest land requirements for a given discharge will be needed for

Question 6

Most of the turbidity meters work on the scattering principle. The turbidity value so obtained expressed in

Question 7

Hardness of water is directly measured by titration with ethylene–di-amine–tetraceticacid (EDTA) using

Question 8

Total Kjeldahl nitrogen is a measure of

Question 9

1 TCU is equivalent to the colour produced by

Question 10

A water treatment plant is designed to treat 1 m3/s of raw water. It has 14 sand filters. Surface area of each filter is 50 m2. What is the loading rate Description: D:\GradeStack Courses\GATE Tests (Sent by Ravi)\Civil-Engineering-2013_files\image054.pngwith two filters out of service for outine backwashing? __________