Time Left - 12:00 mins

ESE 2018: Project Management & Engg. Maths Sectional Quiz 23

Attempt now to get your rank among 470 students!

Question 1

In the critical path method of project planning, free float can be

Question 2

Slack time in PERT analysis

Question 3

Which of the following methods are considered as most favourable to production organizations liable for Taxation?
1. Straight line method of depreciation
2. Declining balance method of depreciation
3. Sum of the years digits method of depreciation
4. Sinking fund method of depreciation
Select the correct answer using the codes given below:

Question 4

Consider the following statements regarding V-belt drive:
1. The groove angle of the sleeve is less than the belt section angle
2. The efficiency of a V-belt drive is higher than that of a flat belt drive
3. The groove angle is so made that the belt gets wedged in the groove
Which of the above statements are correct?

Question 5

The maximum percentage defects that a consumer may find definitely acceptable is called

Question 6

The ‘Economic life’ of a building is considered to be at an end
1. When the net income from the building fails to justify its existence
2. When the building facilities become obsolete
3. When the capitalization rate becomes high
Which of the above statements are correct?

Question 7

For the parallelogram OPQR shown in the sketch, and . The area of the parallelogram is

Question 8

There are two containers, with one containing 4 Red and 3 Green balls and the other containing 3 Blue and 4 Green balls. One ball is drawn at random from each container. The probability that one of the balls is Red and the other is Blue will be

Question 9

Consider the matrixThe sum of its eigen values is _____.

Question 10

The area of the region bounded by the curves and the x-axis is _____.
  • 470 attempts
  • 5 upvotes
  • 6 comments
Sep 8ESE & GATE EC