Question 1
When two plates are placed end to end and are joined by two cover plates, the joint is known as ___________.
Question 2
The time by which the completion of an activity can be delayed without affecting the start of succeeding activities is called _____.
Question 3
If ‘i’ is the rate of interest expressed in decimal and ‘n’ is the number of years, then coefficient of annual sinking fund, Ie is
Question 4
If the average daily water consumption of a city is 1000 cum the peak hourly demand will be:
Question 5
Ozonation in water treatment is done for which of the process :
Question 6
A hydraulic jump occurs in a channel
Question 7
In a turbulent flow in a pipe the shear stress is :
Question 8
The function of shear key in design of retaining wall is :
Question 9
A rain hyetograph is :
Question 10
Where was the 10th East Asia Summit (EAS) held?