Question 1

If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then

Question 2

The method of computing areas by subdividing a plot into triangles is suitable for

Question 3

A circular curve of radius R connects two straights with a deflection angle of 60 °. The tangent length is

Question 4

The reduced bearing of a 10 m long line is N30 °E. The departure of the line is

Question 5

The flow in open channel is said to be subcritical if the Froude number is