Question 1

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the center line. It subtends 180 ° at the center. If the height of the bank is 1 m at lower end, and side slopes 2:1, the earth work involved _______

Question 2

If the plane table is not horizontal in a direction at right angles to the alidade, the line of sight is parallel to the fiducial edge only for __________.

Question 3

The value of mass density in kg.sec2/m4 for water at 0 ° C is ________. (g =9.81 m/s2)

Question 4

In chain surveying field work is limited to _______.

Question 5

Fundamental relationship between dry density (γd), bulk density (γ) and water content (ω) is _____.

Question 6

The moment of inertia of a circular section about any diameter D, is _____.

Question 7

Pick up the correct statement from the following.