A generating station has 500 MW maximum demand and annual load factor of 50%. Capacity factor of 40%. The reserve capacity of the plant is
Question 2
The advantage of hydro-electric power station over thermal power station is
Question 3
Which of the following power stations is mainly used to cover peak load on the system?
Question 4
In what form the initial energy will be released for the 200 MeV per fission by a neutron in a slow thermal nuclear reactor?
Question 5
The high load power plant
Question 6
Which among the following information regarding HVAC Transmission System is incorrect?
Question 7
In the load-frequency control system with free governor action, the increase in load demand under steady condition is met
Question 8
The main objective of load frequency controller is to apply control of
Question 9
The incremental fuel costs for two generating units G1 and G2 are given by and where and are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by
Question 10
A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz.