Question 1

In PERT analysis of a project having large number of activities in its critical path, which of the following assumption is correct?

Question 2

In a PERT activity, the three time estimates are 2, 6,10. The variance of the activity is ____

Question 3

The probability distribution taken to represent the completion time in PERT analysis is

Question 4

For crossing the Panama Canal, a ship takes normally 25 minutes and at a maximum 50 minutes. Find out the expected time for crossing of the canal considering it as a PERT activity of variance 44.44.

Question 5

An activity is analyze using PERT , the most likely time is 3 days, optimistic time is 1day and pessimistic time is 5 days. The probable range of the duration(days) of the activity is?(Take 95% probability).

Question 6

In PERT analysis, the time estimates of activities follow