Time Left - 30:00 mins

GATE2020 Building Materials & CMT Rapid Mini Mock (App update required to attempt this test)

Attempt now to get your rank among 1568 students!

Question 1

Stretcher bond is possible only in

Question 2

Timber can be made fire resistant by

Question 3

Which of the following projects are analyzed by CPM method?
1) Construction of railway sleepers.
2) Planet Venus orbital mission.
3) New treatment for cancer.
4) Suspension bridge inspection.

Question 4

Which of the following is not correct for earnest money?

Question 5

In the context of provisions relating to durability of concrete, consider the following assertion:

Assertion (1): As per IS 456-2000, air entrainment to the extent of 3% to 6% is required for concrete exposed to marine environment.

Assertion (2): The equivalent alkali content (in terms of Na2O equivalent) for a cement containing 1% and 0.6% of Na2O and K2O, respectively, is approximately 1.4% (rounded to 1 decimal place).

Which one of the following statements is correct?

Question 6

The characteristic compressive strength of concrete required in a project is 25 MPa and standard deviation in the observed compressive strength expected at site is 4 MPa. The average compressive strength of cubes tested at different water-cement (w/c) ratios using the same material as is used for the project is given in the table.

The water-cement ratio (in percent, round off to the lower integer) to be used in the mix is________

Question 7

Match List I with List II and select the correct answer using the codes given below-:
List I
P. Gypsum.
Q. Calcium Lignosulphate.
R. Air entraining admixture.
S. Calcium Chloride.
List II
1) Accelerator
2) Water reducer
3) Retarder
4) Reduce segregation

Question 8

For the network shown below, the critical path is ?

Question 9

Chromium and Nickel are added in steel to improve its ___ property?

Question 10

Match List I (Disease of Timber) with List II (Effect of disease) and select the correct codes

Question 11

The free float of activity 3-4 is ________.

Question 12

The network of a small construction project awarded to a contractor is shown in the following figure. The normal duration, crash duration, normal cost, and crash cost of all the activities are shown in the table. The indirect cost incurred by the contractor is INR 5000 per day.

If the project is targeted for completion in 16 days, the total cost (in INR) to be incurred by the contractor would be _____

  • 1568 attempts
  • 6 upvotes
  • 16 comments
Jul 15ESE & GATE CE