Estimation and Costing Quiz 1

Attempt now to get your rank among 1402 students!

Question 1

The value of the property (without being dismantled) at the end of the useful life period is known as _____.

Question 2

Calculate the primary estimate including contractor’s profit in rupees for the building having a plinth area of 1,500 square meters and a rate of Rs.2,000 per square meter.

Question 3

Capitalized value of a property is the product of ___________

Question 4

Calculate an approximate estimate (Rs.) of the building with total plinth area of the building is 500 square meters. The rate of the plinth area is Rs. 3,000 per square meters. The costs of the water supply and contingencies are 7% and 5% of cost of construction respectively.

Question 5

In the estimation of plastering surface the deductions are not made for ________.

Question 6

Cost of Owing an equipment would include

Question 7

In PERT analysis the probability distribution followed by the activity and the project is

Question 8

If the effective plan area of a warehouse is 54 sq. m, and maximum height of piles permitted is 270 cm, then what is the number of cement bags that can be stored?

Question 9

Which of the following is the correct statement for length of the long wall as one move from earthwork to brick work in super structure in long and short wall method?

Question 10

Whenever the whitewashing or distempering is done on corrugated iron sheets, in the estimation the plan area of the sheets is increased by ________.