GATE ME 2021 : Industrial Engineering Quiz 2

Attempt now to get your rank among 679 students!

Question 1

Which of the following scheduling method is accepted by default if no other method is specifically mention while solving problems in scheduling to maintain the flow of job smooth.

Question 2

The objective of sequencing problem is:

Question 3

Apply Johnson algorithm to find out which job is processed first and which job should be processed last for n jobs and 2 machines problems

Question 4

In sequencing n jobs in 3 machine can be done by which of the following sequencing algorithm.

Question 5

There are seven jobs, Each of which has to be processed on machine ‘A’ and then on machine ‘B’ (order of machining is AB) Processing time is given in hours. Find the optimal sequence is which the jobs are to be processed so as to minimise the total elapsed.

Question 6

A job having a processing time of 11 days is to be processed in scheduling operation. The job is to be delivered on 18th july 2018 but the job is received on 7th july. Find the critical ratio of the job to be processed.