Time Left - 30:00 mins

GATE ME 2021 || National Champion Quiz-4 (App update required to attempt this test)

Attempt now to get your rank among 593 students!

Question 1

In a small engineering project, for an activity, the optimistic time is 2 minutes, the most likely time is 5 minutes and the pessimistic time is 8 minutes. What is the expected time of the activity?

Question 2

What maximum output current can be drawn at 100% duty cycle from a welding power source rated at 500A at 60% duty cycle _________?

Question 3

For increasing the material removal rate in turning, without any constraints, the right sequences to adjust the parameters?
1). speed
2). Feed
3). Depth of cut
Select the correct answer using the codes:

Question 4

Maximise  Z =3a+2b

Constraints are

a + b 4

a — b ≤ 2

a, b ≥ 0

Question 5

Processing times (including setup times) and due dates for six jobs waiting to be processed at a work centre are given in the table. The average tardiness (in days) using shortest processing time rule is _________(correct to two decimal places).

Question 6

The Diameter for cylindrical side riser to feed casting of dimension  when designed by modulus method is _________cm.

Question 7

Following data refers to the activities of a project, where, node 1 refers to the start and node 5 refers to the end of the project.

The critical path (CP) in the network is

Question 8

The probability distribution of weekly sale of a certain item is as follow:
12A.jpg
The cost of carrying inventory is Rs. 30 per unit per week and the cost of unit shortage is Rs. 70 per week. The optimum stock level which minimized the total expected cost is _________ units.

Question 9

A CNC vertical roiling machine has to cut a straight slot of 20 mm width and 4 mm depth by a cutter of 15 mm diameter between points (0, 0) and (50, 50) on the xy plane (dimensions in mm). The feed rate used for milling is 45 mm/min. Milling time for the slot (in seconds) is ___________.

Question 10

Match List-I with List-II and select the correct answer using the code given below the lists:
List-I
A). Procurement cost
B). Carrying cost
C). Economic order quality
D). Reorder point
List-II
1). Cost of holding materials
2). Cost of receiving order
3). Procurement lead time
4). Break-even analysis

Question 11

Match Group-I with Group-II and select the correct answer using the codes given below the lists:
Group-I
P) G09
Q) G41
R) G01
S) G03
Group-II
1) Linear Interpolation
2) Retardation
3) Circular interpolation
4) Cutter radius compensation

Question 12

Maximize
Subjects to

In the starting Simplex tableau, x1 and x2 are non-basic variables and the value of Z is zero. The value of Z in the next Simplex tableau is____.
  • 593 attempts
  • 2 upvotes
  • 9 comments
Jul 9ESE & GATE ME