The Y-Bus matrix of a 4-bus system in per unit is given below,, the buses having shunt element are

Question 2

An 80-bus power system has 10 generator buses. For the load flow analysis, using N-R method the size of Jacobian is

Question 3

Statement 1: In Gauss-seidel method rate of convergence is very below.

Statement 2: Gauss-seidel convergence characteristic is linear.

Question 4

A generating station is supplying 100 MW of power to load A & load B of  30MW and 70 MW respectively. The generator capacity is 100 MVA and inertia constant H = 6 MW sec/MVA. Due to fault, load A feeder is tripped. find the steady state frequency deviation due to time delay of 0.5 sec of governing system.

Question 5

Two plants are supplying a load of 200 MW. The fuel inputs per hours of plant land plant 2 are given as

F1 = 0.25 P12+35 P1+100 Rs/hr

F2 = 0.3 P22 +25 P2+120 Rs/hr

The cost of generation corresponding to economic operating schedule is