Time Left - 06:00 mins
ESE 2021 Technical Quiz || Load Flow Analysis, Economic Load Dispatch
Attempt now to get your rank among 272 students!
Question 1
The Y-Bus matrix of a 4-bus system in per unit is given below,, the buses having shunt element are
Question 2
An 80-bus power system has 10 generator buses. For the load flow analysis, using N-R method the size of Jacobian is
Question 3
Statement 1: In Gauss-seidel method rate of convergence is very below.
Statement 2: Gauss-seidel convergence characteristic is linear.
Question 4
A generating station is supplying 100 MW of power to load A & load B of 30MW and 70 MW respectively. The generator capacity is 100 MVA and inertia constant H = 6 MW sec/MVA. Due to fault, load A feeder is tripped. find the steady state frequency deviation due to time delay of 0.5 sec of governing system.
Question 5
Two plants are supplying a load of 200 MW. The fuel inputs per hours of plant land plant 2 are given as
F1 = 0.25 P12+35 P1+100 Rs/hr
F2 = 0.3 P22 +25 P2+120 Rs/hr
The cost of generation corresponding to economic operating schedule is
- 272 attempts
- 1 upvote
- 0 comments
May 18ESE & GATE EE