Time Left - 08:00 mins
RVUNL_CE_Quiz 71
Attempt now to get your rank among 453 students!
Question 1
The least count of the vernier is equal to
Question 2
Statement (I) : The fundamental principle of surveying is 'to work from the whole to the part'.
Statement (II) : Working from the whole to the part ensures prevention of accumulation of possible errors in survey work over large areas.
Question 3
Among various stages of survey in highway alignment, the correct sequence is
Question 4
The type of surveying in which curvature of earth surface is taken into consideration is
Question 5
Which of the following objectives can be achieved by surveying?
i. Preparing archeological maps. Geological maps military maps etc.
ii. Determining Relative position of desired points with respect to a known bench mark.
iii. To measure distance between two points.
iv. Laying Out the alignment of roads, railways etc
Question 6
Consider the following statements:
Statement 1: In surveying a large part of area is divided into smaller part. The details of there smaller parts are measured using any method of surveying .
Statement 2: This principle of surveying is known as working from whole to part.
- 453 attempts
- 3 upvotes
- 13 comments
Tags :
AE & JE ExamsJun 28AE & JE Exams