GATE (CE) 2022: Environment Engineering

Attempt now to get your rank among 299 students!

Question 1

Which one of the following statement is FALSE about Jackson Turbiditimeters?

Question 2

A 180 cc of water sample drawn on to a empty dry crucible whose initial mass is found to be 98.636 gm. After oven drying at 103’C its final mass is 98.697gm. Then it is kept in a muffle furnace at 700’C for an hour. After cooling the mass of the sample in crucible is 98.654gm. The volatile solids present in the water sample (in mg/lit) is

Question 3

A water treatment plant is to treat 50 MLD by international standards. The amount (in kg) of bleaching powder (having 64% impurity) needed per day, if the chlorine demand of the water is 2 mg/l, will be ______ kg.

Question 4

Match List-I (Treatment method) with List-II (Important design parameter) and select the correct answer using the codes given below the lists:

Question 5

If the intensity of sound source is decreased 16 times to its earlier intensity, then the intensity level of source will be decreased by _____ dB.

Question 6

A rectangular sedimentation tank is designed for a surface overflow rate (surface overloading) of 400 litre/hour/m2. The percentage of the suspended particles of diameter 0.01 mm that will be removed in the tank is ___________.
[Take kinematic viscosity of water = 1 mm2/sec and specific gravity of particle = 2.65]