A production line is said to be balanced when
Question 2
A 5 station assembly line has allotted times 7, 9, 8, 6 and 5 minutes respectively. What is the balance delay __________?
Question 3
An electronic equipment manufacturer has decided to add a component subassembly operation that can produce 80 units during a regular 8-hour shift. This operation consists of three activities as below:
For line balancing the number of work stations required for the activities M, E and T would respectively be __________.
Question 4
A stopwatch time study on an operator with a performance rating of 120 yielded a time of 2 min. If allowances of 10% of the total available time are to be given, the standard time of the operation is ___________.
Question 5
A welding operation is time-studied during which a operator was pace-rated as 120%. The operator took, on an average, 8 minutes for producing the weld-joint. If a total of 10% allowances are allowed for this operation, the expected standard production rate of the weld-joint (in units per 8 hour day) is
Question 6
During the development of a product, an entirely new process plan is made based on design logic, examination of geometry and tolerance information. This type of process planning is known as
Question 7
Production flow analysis (PFA) is a method of identifying part families that uses data from
Question 8
Which of the following scheduling process in a job shop is generally applied to minimize the average inventory __________.
Question 9
In project scheduling, networks have an advangate over Gantt charts since networks
Question 10
Which one of the following statements is not correct
Question 11
The sequencing of jobs in the ascending order of their processing time, is called