Question 1

Water supply to a house begins with connection of the service pipe with municipal water mains. The connection sequence comprises

a) Stopcock

b) Gooseneck

c) Ferrule

d) Water meter

Select the correct sequence from the options given below:

Question 2

Which of the following is common, when a valve closes suddenly at an end of a pipeline system, and a pressure wave propagates in the pipe?

Question 3

For the sewers of diameter less than 600 mm, the type of joint preferred may be

Question 4

Which of the following valve is prevent the entry of debris into pumping system?

Question 5

Before entering a manhole a candle is lowered into the manhole

Question 6

A: Sanitary pipes should be laid out straight as far as possible.

R: Straight piping reduces plumbing cost.

Question 7

A sluice valve in water distribution system is used to

Question 8

Which one of the following is the purpose of providing surge tank in pipelines carrying water?

Question 9

Which one of the pipe fittings has least frictional resistance in equivalent pipe lengths in terms of the diameter of the pipe

Question 10

The design period for clear water conveying mains is